Andhra Pradesh Power Supply Position from 16-Jul-2019 to 16-Jul-2019
Date Energy Required (MU) Energy Met (MU) Energy +/- (MU) Genco Thermal Genco Hydel Genco Total CGS and Purchases IPPS (GAS) NCEs & Others AP Share of TGISTS Grand Total Reversible Pump Consumption Unrestricted Peak Demand (MW) Deficit/Surplus (MW)
16-Jul-2019 175.925 175.925 0.000 77.703 6.294 83.997 52.156 20.628 64.762 -45.618 175.925 0.000 8408 0
Total 175.925 175.925 0.000 77.703 6.294 83.997 52.156 20.628 64.762 -45.618 175.925 0.000 *8408
(16-Jul-2019)

        * The highest Peak Demand during the selected period